Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof by Easy-Going

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof

$82.00
Sale price  $82.00 Regular price 
Skip to product information
Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof by Easy-Going

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof

$82.00
Sale price  $82.00 Regular price 
Shipping calculated at checkout.

Product Overview

Functional and waterproof, the Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal earns its place in backyard projects through outdoor performance. Designed with Polyester, measuring 84"L x 110"W, available in Teal. Notable features include tab top and top bottom, contributing to its lightweight character.

Key Features

  • Tab Top & Bottom: Constructed with detachable tab top, which makes the curtains to be moved around and hung with ease. The bottom tabs make the curtain fixed enough that it won't be blown by the wind. It provides protection against rain, snow, heavy wind and other harsh weather element.
  • Multiple Options: Come in a range of colors and sizes to match the decoration of your outdoor space. Each package includes 2 panels of outdoor curtains, each measures width 110 inch by length 84 inch.
  • High Quality Material: 100% polyester fabric with waterproof processing technology, is also able to block out sunlight and UV ray. It is efficient in noise reducing, insulating against heat.
  • Widely Used: Perfect for both indoor and outdoor spaces. These outdoor curtains provide great privacy and safety for your porch, pool, balcony, gazebo, patio pergola, garden, bathroom or indoor rooms.
  • Easy to Care: The curtains are machine washable in cold water, please do not bleach, tumble dry and iron at low temperature.

Why Choose the Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana

The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal delivers on three fronts: all-season build, tab top, and easy installation. This combination makes it suited for serious outdoor curtains use.

Best For

The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana is best suited for: both indoor and outdoor spaces.

Quick Summary

The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana is a Outdoor Curtains product by Easy-Going. Brand: Easy-Going. Color: Teal. Material: Polyester. Product Dimensions: 84"L x 110"W. Opacity: 85. Price: $82.48.

Product Specifications

Specification Details
Brand Easy-Going
Color Teal
Material Polyester
Product Dimensions 84"L x 110"W
Opacity 85

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Shop The Full Collection

, CANAGROW Heavy-Duty Garden Plant Trellis Netting

, CANAGROW Heavy-Duty Garden Plant Trellis Netting

, CANAGROW Heavy-Duty Garden Plant Trellis Netting

$36.00
Sale price  $36.00 Regular price 
- Invisible Pot Feet to Elevate up to 8 Flower Plant Planters or Statues |

- Invisible Pot Feet to Elevate up to 8 Flower Plant Planters or Statues |

1 Gallon Air Pruning Containers, New Plastic Nursery Pots, Fruit Vegetable

1 Gallon Air Pruning Containers, New Plastic Nursery Pots, Fruit Vegetable

1 Gallon Nursery Pot Plastic Planters

1 Gallon Nursery Pot Plastic Planters

1 Gallon Nursery Pot Plastic Planters

$41.00
Sale price  $41.00 Regular price 
1 Pack Extra-Large Metal Outdoor Side Tables 18 Inches Outside End Table

1 Pack Extra-Large Metal Outdoor Side Tables 18 Inches Outside End Table

1 Pack Hanging Planters for Indoor Black Plant Hanger

1 Pack Hanging Planters for Indoor Black Plant Hanger

1 Pack Hanging Planters for Indoor Black Plant Hanger

$36.00
Sale price  $36.00 Regular price 
1 Pack Heavy Duty Retractable Plant Hangers, Adjustable Pull-Down Pulleys

1 Pack Heavy Duty Retractable Plant Hangers, Adjustable Pull-Down Pulleys

1 Pack LED Flood Lights Outdoor, 100W 10000LM Super Bright Floodlight Outside

1 Pack LED Flood Lights Outdoor, 100W 10000LM Super Bright Floodlight Outside